Specifications include, but are not limited to: The contractor shall conduct (i) quarterly potable water testing for the non-residential buildings at JPPM; (ii) semi-annual testing (twice per year) for the residential, private wells at JPPM; and (iii) other periodic testing of the public potable water systems throughout the complex as mandated by the MDE and per JPPM sampling plan. The contractor will take all samples from designated faucets per the sampling plan, unless otherwise mandated by MDE. The contractor must provide test results to JPPM by the due dates established in the JPPM contract. The contractor will schedule testing dates and testing result due dates in consultation with the Executive Director of JPPM or a designee.