Specifications include, but are not limited to: B. Acceptable products for sanitary sewer pipe lining are Ultra Violet Cured in Place Pipe Lining or steam cured in place lining conforming to the American Society for Testing and Materials (ASTM) standards. C. The contractor will be responsible for any by-pass pumping required during construction and restore any areas that are disturbed as a result of the lining operations. D. Clean, remove tree roots, and provide a Pre- Closed Circuit Television (CCTV) of sewer pipe. E. Provide a post rehabilitation CCTV inspection of sewer pipe. F. The City will permit partial closure of Park Avenue as long as access to residential property driveways can be maintained. The cost of traffic control is the sole responsibility of the Successful Vendor in the event of road closure. G. Contractor is responsible for any staging or storage area for materials and equipment. H. The City can provide video of existing conditions within the sanitary sewer to the Successful Vendor.