The Work of Project is defined by the Contract Documents and consists of the following: 1. Tall Oaks Pavilion: Repair structure, replace asphalt shingles, masonry pointing at chimney and walls, re-do the entrance steps, lower slab, salvage and re-install in the same location original flagstone, site accessibility, and electrical upgrade. 2. Tamarack Pavilion: Repair structure, replace asphalt shingles, lower slab, salvage and reinstall in the same location original flagstone, site accessibility, and electrical upgrade. 3. Comfort Station: The current comfort station will be demolished to build a new comfort station with site accessibility. 4. Rec Hall: Selective demolition, full interior and exterior paint, replace asphalt shingles. 5. Beach Improvements: extensive site work to reconfigure drainage patterns, and site accessibility.