Specifications include, but are not limited to: The Contractor shall furnish all labor and materials for temporary facilities required during construction operations. The Contractor is responsible for all costs associated with any temporary facilities provided. A. The Contractor shall provide all equipment and do all work necessary to prepare the site, complete, as indicated on the drawings and as specified. B. Demolition work, as specified herein, is not intended to be performed as a wrecking operation but as preparatory work relative to the performance of the various construction operations of the Project. The Contractor shall pay special attention to the Project Limits as shown on Plans. C. Items involved in the demolition and/or excavation such as pavement and sidewalks of whatever material shall not be classified as rock or hard surface excavation.