Specifications include, but are not limited to: 1. Provide all labor, materials and supplies to dismantle the pallet rack and shelving systems at the current warehouse location, relocate, and reassemble the pallet rack and shelving systems at the new warehouse location in the designated areas per the HCPSS Contract Manager. The unloading and reloading of the shelves will be the responsibility of the school system. 2. The scope of work will consist of two parts: the deconstruction of the Husky racking system and commercial industrial shelving units. a) The Husky racking system shall be properly deconstructed, stacked, secured on pallets and relocated to the new location. Exiting studs will be cut flush to concrete floor. The rack system will be reassembled according to the architectural layout and properly secured to the concrete floor ready for reloading. b) The general commercial metal shelving will be disassembled, stacked and relocated to the new location. It will be reassembled per the layout to be provided. 7' high x 4'wide - 247 Bays 8' high x 5' wide - 13 Bays 9' high x 4' wide - 15 Bays 12' high x 8' wide - 10 Bays