Specifications include, but are not limited to: The MDOT MVA’s prime objective is to retain the services of a Contractor who can provide timely and quality services to ensure landscaping services to the MDOT MVA HQ facility, at the Contractor’s bid prices. 2.6.1 During the mowing season (April through October 31), all lawn areas shall be mowed every five to ten days as weather conditions dictate or as directed by the MDOT MVA. 2.6.2 Contractor shall provide all labor, equipment and materials necessary for performing mowing of turf areas. 2.6.3 Prior to mowing, Contractor shall ensure that the area to be mowed is clean and free of all debris (paper, stones, bottles, tree limbs, etc.). Debris removal must be completed by the Contractor prior to beginning mowing. All debris must be disposed of properly by the Contractor. 2.6.4 In general, mowing height of turf shall not exceed 2”, however, height should be based on the type of grass(es) present at the facility and according to the most current University of Maryland standards. No more than one-third of the (grassy) leaf blades shall be removed at any one time. 2.6.5 Mowing equipment shall be operated at the optimum speed that produces clean cutting results. Care shall be taken to control dust while mowing. All mowers shall be equipped with skirt guards and mulching mowers. Mowing equipment shall be the optimum size to produce clean cutting results. Uneven cuts, scalping and varying heights of turf will be considered unsatisfactory. Mowing patterns shall be alternated to avoid creating ruts and compaction. All mowing equipment should be calibrated to mow at a uniform height. 2.6.6 If mowing causes excessive clippings, turf shall be swept, and clippings removed at no additional charge to MDOT MVA. 2.6.7 Contractor will be responsible for scheduling mowing in accordance with irrigation schedules. When all or a portion of any area is not mowable due to excessive ground moisture, standing water, etc., Contractor shall notify the CFMO of the delay in scheduling, and indicate the plan to reschedule the mowing. When large portions of any contract area are not mowable due to excessive ground moisture or standing water, the CFMO may deduct a reasonable pro-rated amount from the monthly payment to the Contractor.