Specifications include, but are not limited to: Contractor shall be responsible for having a professionally licensed underground utility company locate and mark all utilities in the area that work will be performed in, if necessary. Contractor shall be responsible for providing all labor, equipment and materials to mark, square off, saw cut and excavate around 30-35 designated areas (pot holes), not to exceed 12,000 square feet, combined, at the above locations. Each area will be excavated up to 4” (inches), removing all of the demo materials, clean areas and remove from the site. The Contractor shall square cut each area and compact that area to prepare it for new materials. The Contractor shall apply a tact coat around the edges of each area. The Contractor shall install new 4-inch approved asphalt, 2.5 inch 19mm base asphalt and compact.