Specifications include, but are not limited to: A. Piping: The Contractor shall perform pressure testing on all piping systems as indicated in Division-23 section “Testing, Adjusting and Balancing”, and elsewhere as indicated. B. Final pressure test results shall be submitted as a separate project submittal for review and included with the Test and Balance Report. Upon review for general conformance, include all pressure tests in the O & M Manual. C. All factory performed equipment test results shall be included in the final O & M Manuals. A. Install motor starters and controllers as indicated on the Drawings, in strict accordance with the manufacturer's written instructions, and in compliance with recognized industry practices. B. Install fuses or current limiters when required by the equipment specifications. C. Tighten connections and terminations in accordance with the manufacturer's published torque tightening values or in accordance with UL Standard 486A and B when manufacturer's values are not indicated. D. Prior to energizing equipment, check power and control wiring for correct installation. After energizing equipment, check each motor for proper phase rotation, correct where necessary, and demonstrate operation of starter and accessories. E. Program VFDs as required for each individual load. Programming shall include preset speeds, restart attempts and delays, overload settings, frequency avoidance bands, etc. F. The installation of external filters with VFDs shall include all necessary conduit and wiring between the filter and the VFD. Where VFD bypass switches are provided, filter shall be connected so that it is isolated from the VFD in the bypass mode.