Specifications include, but are not limited to: A. Electrical demolition shall be carried out per the Contract Documents. Remove all electrical work indicated to be removed including conduits, cables, power, wiring, lighting and special systems. B. Provide all cutting and patching for electrical construction. A. The Contractor shall examine the site, determine all conditions and circumstances and gather all data and information required for the work. B. The Contractor shall survey all new and existing wiring, circuitry, cabling, equipment and devices. Data gathering shall include, but not be limited to, equipment nameplate information, ratings, voltage, wiring configurations, conductor lengths, conductor routing, conductor sizes, equipment connections, and other information as required to maintain existing systems. C. The Contractor shall provide complete field investigations to determine existing and new conductor, cable and conduit routing, points of connections, and tracing of existing systems. D. The contractor shall assume that all information shall be obtained from field surveys and not from Owner’s records. If Owner’s records are made available to the Contractor, for information only, the Contractor shall verify the Owner’s Records with the existing conditions. E. Field investigations include, but are not limited to, performing surveys, opening of equipment enclosures, and other work as required to maintain existing systems.