Specifications include, but are not limited to: The project consists of supplying the labor, equipment, tools, and materials for the construction of the Rockville Civic Center Park Hayes Forest Bridge Replacement project. The scope of work includes but is not limited to the following: 1. Removal and disposal of existing timber bridge 2. Installation of a temporary bridge structure 3. Installation of driven timber foundation piles 4. Installation of new timber pedestrian bridge 5. Grading and excavation 6. Clearing and grubbing, tree removal and tree protection measures 7. Seed and mulch stabilization 8. Sediment control and root pruning 9. Installation of a temporary Stabilized Construction Entrance 10. Installation of a temporary concrete washout structure 11. Temporary work zone traffic controls and signage 12. Clean up and final inspection approvals