Specifications include, but are not limited to: Testing scope shall include entire HVAC installation, from central equipment for heat generation and refrigeration through distribution systems to each conditioned space. It shall include measuring capacities and effectiveness of operational and control functions. 2. Test all operating modes, interlocks, control responses, responses to abnormal or emergency conditions, and verify proper response of building automation system controllers and sensors. ; s. HVAC contractor shall prepare pipe system cleaning, flushing, and hydrostatic testing. ; Reports shall include measured data, data sheets, and a comprehensive summary describing the operation of systems at the time of testing. 2. Include data sheets for each controller to verify proper operation of the control system, the system it serves, the service it provides, and its location. For each controller, provide space for recording its readout, the reading at the controller's sensor(s), plus comments. ; Mechanical fasteners: Adhesively attached, minimum 12-gauge zinc-plated steel pin welded to a 2 inch by 2 inch, 22 gauge minimum galvanized steel perforated baseplate and selflocking retaining washer. Pin length as required.