Specifications include, but are not limited to: 3.2.2.1 Demolition; 3.2.2.2 Rough carpentry; 3.2.2.3 Finish carpentry; 3.2.2.4 Sheetrock installation and finishing; to include priming and finished painting; 3.2.2.5 Relocating/installing interior walls and partitions; 3.2.2.6 Suspended ceilings; 3.2.2.7 Weather proofing of doors; 3.2.2.8 Repair/replace of moldings or trim, doors, and door jambs; 3.2.2.9 Coordination of the work with other trades; 3.2.2.10 Vinyl composition tile (VCT) and carpet tiles installation; 3.2.2.11 Minor CMU/Concrete demolition and reconstruction to include any paint restoration; and 3.2.2.12 General laborer tasks to include material and furniture relocation in the facility and snow removal.