Specifications include, but are not limited to: Remove all gutters & downspouts app 110 lf. Remove & dispose of previously abandoned alarm system and associated components, terminate the wiring. Remove 6 exterior lights. Modify existing wiring as needed to reuse for new light fixtures. Remove existing vinyl siding, fascia, trim, soffit, etc. down to bare sheathing. Remove gable vents and completely close the openings. Replace any deteriorated wall sheathing, wall framing, fascia/rake boards. Wrap all fascia, rake and trim moulding in aluminum. Remove windows and replace with vinyl new construction windows. Properly prepare, prime and paint block foundation walls, exterior basement stairwell with 2 coats of exterior paint. Install new vinyl siding. Install new gutter (app 100 lf) system including leaf guards, straps, fasteners, downspouts, drain extenders, etc. Install 6 new LED lights in same location as exiting lights. New LED light fixtures shall be equipped with dusk to dawn operation. Remove and dispose of debris off site.