Specifications include, but are not limited to: The scope of this project is to replace all exterior glass and glazing, with the exception of the courtyard, including abatement and temporary protection. Existing punched opening windows are approximately 2’W x 72”H and in groups of 2 or 4, assuming removal of precast perimeter band and masonry piers between windows. Cut sill down approximately 3 brick courses. Window to fill entire opening. Metal panning at perimeter of opening. New brick sill on exterior and solid surface sill on interior for 52 windows. Existing storefront to be replaced in its entirety (2) locations adjacent to the gym and (1) main entrance assuming structural framing members will be covered by the glazing system and that new hollow metal doors will be installed to structural members with continuous hinges. Replace all 45 exterior doors. Doors, other than those in storefronts, include frame and borrowed light replacement. An allowance to remove and reinstall acoustical ceiling at select locations and miscellaneous floor repair is included. Miscellaneous other work to include pan over existing false louvers at the gym, install thermal film on the glazing at the courtyard, window treatments for the classrooms and administration, electronic locksets, card readers and power supplies for 10 doors (head and others), and install EX/EM lights will remote heads at all exterior door locations, and power wash the building exterior. There will be an add alternate for gutters and downspouts for the exterior of the building.