Specifications include, but are not limited to: Provide the engineered evaluation and design required to construct a distribution water pump station to our existing gravity flow water chemical enhancement facility. this shall include the following; additional building to house pumps and associated equipment or building modifications/additions, water distribution pumps (lead, lag and spare configuration), pump controls, electrical, plumbing, HVAC, sewer connection to County’s main service (if required), additional chemical feed equipment (as needed), analytical equipment and SCADA system upgrades to our current chemical enhancement facility to incorporate all required equipment needed to institute a fully operational distribution water pump station.