Specifications include, but are not limited to: Cleans the piercing units Cleans the plungers, plunger channels and spacers Applies silicon grease to plunger o-rings Wipes P-spindle and linear shafts Wipe Z-spindle and LM guide with a lint free cloth Applies oil to Z-spindle Applies yellow grease to LM guide grooves Wipes M-Motor spindle with a lint free cloth Cleans M-motor inside threads Apply oil to M-motor spindle Wipes Y-axis LM guides with a lint free cloth Applies yellow grease to Y-Axis LM guides Replaces nozzle O-rings Replaces Plunger O-rings Verifies the Y-axis teaching is within manufacturer’s specification Verifies the Z-axis teaching is within the manufacture’s specification Verifies the P-axis teachings is within the manufacturers specification Performs a temperature test to ensure that the temperature settings are within the manufacturer’s specification Performs a leakage test (no dripping observed coming from the tips during the test) Performs a UV light test – minimum 20 minute light run without error Performs a 100ul pipetting test – volumes must be between 92ul and 108ul to pass and must be tested using 14 tubes. Results must be given in the form of initial weight in g, final weight in g and volume in ul. Performs a 500ul pipetting test – volumes must be between 460ul and 540ul to pass and must be tested using 14 tubes. Results must be given in form of initial weight in g, final weight in g and volume in ul. Vendor may use an onsite calibrated balance for the pipetting accuracy test Performs an overall system inspection Provides a preventive maintenance report/record to the laboratory with results upon completion of preventive maintenance.