Specifications include, but are not limited to: 1. All work necessary to design the contemplated renovations and additions to the existing Detention Center as described in the Master Plan and Facility Program, in accordance with the Requirements of the OWNER and as required by the Authorities Having Jurisdiction (AHJ). 2. All architectural, structural, mechanical, plumbing, security, voice & data, and electrical work. Design shall provide for an ADA compliant, fully functional Detention Center with all necessary peripheral improvements including but not limited to: building security, all low & high voltage systems, emergency backup power systems, fire alarm and fire suppression systems, electric power supply coordination with the local power company, telephone, cable and other utility providers as may be applicable. The Design shall include a Continuity of Operations component which provides via for full, uninterrupted operation of the Detention Center and associated critical facilities through the duration of construction. 3. The design and construction of this project shall, to the greatest extent practicable, utilize Energy Star-qualified equipment, building components and other technologies which minimize energy consumption and costs 4. All land design necessary to support building renovation and Continuity of Operations including but not limited to site grading, access, stormwater management (SWM), lighting, and utility upgrades as maybe required.