Specifications include, but are not limited to: The work includes, but is not limited to Mobilization/demobilization, furnishing of all materials, all labor, materials, equipment and services necessary to provide, and construct complete in place, the Daniels Area Wastewater Pumping Station Upgrade, including, but is not limited to, construction trailer; station bypass; wastewater pumping units; wetwell and valve vault; station piping and valves; generator; HVAC and plumbing appurtenances; electrical work; controls; site work; paving; architectural work including roofing, doors and louvers; structural foundation work and incidental items of work as shown on the contract drawings and specified in the contract specifications