Specifications include, but are not limited to:. The contractor shall implement the SITE IMPROVEMENTS for the PERRYVILLE TOWN HALL – PHASE II construction plan set as well as Design/Build the Little League Concession / Restroom Building (max. footprint 52’x23’) for the Town of Perryville. The design and construction of the building shall have three concept scenarios with associated cost estimates. The proposed building will be used for concessions, restrooms, and storage. The first is a single story building with attic storage. The second is a single story building with attic storage with a raised roof of an additional 3-4 feet for more storage capacity. The final scenario is a two story building, but the second story is only half the footprint of the ground floor level. The contractor shall then construct the appropriate Little League Concession / Restroom Building chosen by the Town of Perryville. The town is open to alternative building construction methods such as pre-fabrication as alternative proposals.