Specifications include, but are not limited to: A. MSA intends to issue a Request for Proposals (RFP) to obtain a highly qualified contractor to install an upgrade to the HVAC and lighting controls, along with the submetering system at M&T Bank Stadium.B. The existing HVAC controls are a Johnson DDC control network with an Andover Continuum overlay. All HVAC controls will be completely replaced and added as a second building to the existing Schneider Electric EcoStruxure software that MSA currently is installing at the Warehouse at Camden Yards. C. The existing lighting controls are a Microlite system that is no longer supported. The lighting controls will be completely replaced and integrated into the new BAS.D. All existing electrical meters will be replaced with new Schneider meters and integrated into the Schneider Power Logic Monitoring software used by MSA in other facilities on the Complex.Note: Controls upgrades to generators at the Hamburg Street Generator Plant and the Chiller Plant at Oriole Park will be bid as alternates. D. The selected contractor will be responsible for the entire project, including architectural, mechanical, electrical, controls, IT, etc. E. The project will be phased construction to minimize disturbance to events, games, etc.