Specifications include, but are not limited to: 1. Base Bid: Floating Dock Replacement with associated Gangway. 2. Add Alternate: Renovations to existing gravel pedestrian walkway as shown on plans, graded to meet existing stair base and proposed gangway. The Contractor is to construct the gravel path as shown on these plans. The Contractor is to demolish and remove portions of the existing wooden walkway and wooden retaining wall as shown on these plans to accomplish the proper grading of the pedestrian walkway. 1. Excavate and remove Unsuitable Material from Site CY 100 2. Furnish, Deliver, Spread and Compact Suitable Material from Off-Site CY 100 3. Graded Aggregate Base CY 10 4. Guide Piles for Prefabricated Floating Dock EA 4