Specifications include, but are not limited to: Work consists of replacingtheexisting Air Handling Unit and condenserwithnew AHU & condenserand associated componentsof equal, or better capacity and performance characteristics.Unitsare located in the SMPRU AdministrationBuilding Penthouse Mechanical Room& roof.It will be the responsibility of the contractor to verifytheexact location of the units and the modifications necessary to fit properly in the available space for a fully functional systemwithout any additional costs to the Owner.The work will also include providing or modifying existinghousekeepingpad in which to provide a base for theinstallation of thenew AHU. Removing and replacing all refrigerant piping for the complete refrigeration system to include valves.