The renovation scope includes upgrades across multiple areas. In the mechanical room, walls, doors, and ceilings will be cleaned, patched, and painted; unused equipment will be removed; and the HVAC system will be converted to natural gas, eliminating the need for the oil tank. Staff and Patron Restrooms will get all-new fixtures, LED lighting, and improved accessibility. Staff restrooms will include a closet and concealed piping, while patron restrooms will be reconfigured for single-use with ADA compliance, a baby changing station, and new tile. The Staff Area will receive new carpet, modular walls, a drop ceiling, and a reversed door swing. The Staff Lounge will include a sink, microwave, new shelving, counters, and a drywall partition separating it from the multipurpose area. The children’s and adult areas will receive new flooring, painted walls, glazed brick, reconfigured shelving, and ceiling grid upgrades. Exterior work includes replacing the trim coil and soffit, as well as repainting ADA-compliant handrails and smoking areas. Data and A/V systems will be updated with relocated power poles and a new monitor. Doors and hardware will switch to lever handles, and minor electrical work will include new outlets, switches, and lighting. General notes address project duration, ADA compliance, finish selections, and furniture layouts provided by the Owner