Specifications include, but are not limited to: .Contractor will install a new three (3) ton Split System (base of design Trane 4TTA4060A3000A (outdoor section, and TEM 4A0C60S515B 208/230 volts) to service the gymnasium. This will include at a minimum: o the outdoor unit shall sit on an equipment pad located as indicated in attachment 1 o line set between outside and indoor section will be ran in brown wall duct. o install new indoor section in the ceiling of the storage space as indicated in attachment 1 o the discharge will require duct work and a supply grill to and through an owner provided opening from the gymnasium to the storage room of about 16” x 36" o the return will be open plenum return facilitated by an owner installed door louver. o electrical and condensate drainage to the available access point electrical will be ran and connected to Panel 2 located in the storage room 120/208 Volts condensate will pumped to the exterior of the building o other tasks and materials germane to the installation. Refrigerant piping shall be pressure tested to 550 psi and evacuated to below 500 microns. The contractor will charge system and check operation. Contractor will provide and install local control. The local control thermostat will be cooling only, the cooling demand circuit will be tied into an existing relay to prevent operations while the building is in the cooling mode.