The Contractor shall construct two offices, approximately 156 sq ft (12’x13’ interior) with steel studs and 5/8” gypsum and insulated with 3” rock wool for sound proofing. The Contractor shall coordinate with the district electrician, for the relocation of door locks and sprinkler contractor for the relocation of sprinkler heads. The contractor will relocate existing doors to new offices and move entrance to HR file storage to mail room. The existing card reader and door will be used. Carpet shall remain in place for the new offices and ceiling tile and track will be cut and reused to meet new finished walls. Gypsum to be finished to existing walls and existing walls to be repainted where they adjoin to new walls.