Specifications include, but are not limited to: 1. Contractor shall install approximately 1300 feet of 1 ΒΌβ HDPE conduit from the MDBC manhole to the SHA shop building. Contractor shall core drill into MDBC manhole and seal connection. Yellow path below is approximate path. 2. Contractor shall install 3 new manholes. One at the end of the island, one at the SHA fence, and a last one outside the building. 3. Contractor shall install approximately 1450 feet of 24 count single mode outdoor rated fiber with trace wire entire path from MDBC manhole to the computer room in SHA. 4. Contractor shall terminate all 24 fibers in the SHA computer room. 5. Contractor shall supply and install approximately 100 feet of plenum rated inner duct inside the SHA from the computer room to the end of the SHA building. 6. penetration. All wall penetrations will have to be repaired and fireproofed. 7. Contractor shall connect inner duct from inside of building to 1.5β ridge conduit to be mounted to the outside along the wall. 8. Rigid pipe shall connect to underground build to connect to the SHA. 9. Contractor shall terminate all 24 fibers in the MDBC shelter. 10. All fiber panels shall be SC connectors.