This project scope consists of: A) Arboretum Design Development: Perform site evaluation and existing site condition assessment to develop a multiphase plan that can be implemented over time to establish RedGate Park as an Arboretum. This plan should provide a roadmap to make the park a Level 1, Level 2, and Level 3 arboretum, and should consist of the following, at a minimum: establish a system inventory database to record existing conditions using GIS mapping and GPS location data; layout the arboreta plantings, paths and walkways, entrances, and feature landscapes; outline educational opportunities and signage; identify invasive species and establish an invasive species management plan; and, establish a detailed maintenance plan with proposed mowing, weeding, and watering schedule, and routine tree care recommendations. Include with maintenance plan a rough order of magnitude cost for yearly maintenance. B) Existing Trail and Parking Lot Maintenance, Rehabilitation, and Enhancement Plan: Perform an evaluation of the existing trails and parking lot, and provide a detailed maintenance, rehabilitation, and enhancement plan. The final plan should be focused on enhancing the current trail system in the park and should include mapping of all existing paved and non-paved pathways, identifying the pathways to remain, pathways to abandon and remove, the ADA-accessible routes to the features and amenities, and new pathways (paved and non-paved) to be added. The plan should also include general recommendations on rehabilitating and maintaining the existing parking lot, including ADA improvements...