IFB #28-25 Potomac Valley Road Sidewalk Project is for the construction of a concrete sidewalk on the north side of Potomac Valley Road between Falls Road and New Mark Esplanade, and other associated work as shown on the Contract Drawings and included in these specifications. The project consists of supplying the materials, labor, equipment, tools, and services for the Potomac Valley Road Sidewalk Project as specified in the contract documents. The scope of work includes but is not limited to the following: • Remove trees and stumps; • Provide and maintain erosion and sediment control and tree protection measures at all times throughout the construction period; • Construct conventional concrete, pervious concrete and flexipave sidewalk; • Construct concrete curb and gutter; • Construct storm drain structures and pipes; • Construct retaining wall structures; • Restoration of all disturbed areas; • Landscaping including the planting of trees