1. The Work under the Contract, as further detailed on the attached technical specifications and Drawings, shall consists of: a. To provide all labor and equipment necessary to perform the specified shoreline protection work, b. Mobilization and demobilization of equipment, and personnel, c. Protection of existing site, including regulated coastal areas and adjacent properties, d. Installation and maintenance of environmental controls, e. Construction of the bulkhead/retaining wall above the MHHW line, f. Removal of the silt fence (SF) and super silt fence (SSF) from the site, g. Backfill and grading behind the new bulkhead/retaining wall h. All other Work either shown on the Drawings or included in the Specifications, unless specifically indicated as not to be done. 2. In addition, the Work under the Contract includes: a. Work outside the Project Site, as may be called for in the Contract Documents and as may be required for the performance of the Work. b. The restoration of any items, structures, or embankments damaged or destroyed by activity upon areas or items of work outside the Project Site or not specifically intended to be altered by the Scope of Work. c. Providing and restoring, where appropriate, all temporary facilities