Specifications include, but are not limited to: Phase One, the new switches will be configured and tested. The existing configuration will primarily be migrated to the new pair of switches, with changes appropriate to the move from IOS to IOS-XE. Existing connections will be moved to the new pair of switches. There are existing 1G copper and fiber connections, some existing 10G connections, and a few 10G connections to server switches. MIA has 15 user access switches and about 300 staff members. Ensure all services, functionality and Quality of Service are working as before the installation started. MIA will supply rack space, power, and any cables needed. Partner will rack and cable the new switches. Phase Two will consist of the planning, configuration, and testing of Access Control Lists to segment between trusted and untrusted users accessing applications. This will require discovery to determine the access and applications involved, and the user groups to be controlled. ACLs will then be developed, applied, and tested. For Technical Services: Must be Certified in Cisco CCIE Collaboration or CCIE Enterprise Infrastructure