Specifications include, but are not limited to: Contractor is to obtain all necessary permits. Remove existing roof shingles, felt paper, drip edge, plumbing vent boots, and all flashings. Provide and install new underlayment material, minimum 30 LB felt paper. Provide and install new white wide drip edge at all eaves and rakes. Provide and install ice and water shield at all eaves and rakes as well at all valleys and any roof and wall junctions. Provide and install new thirty year architectural shingles per manufacturers’ installation instructions. Provide and install roof ridge venting with ridge caps as necessary. Provide and install new plumbing vent boots per manufacturer’s instructions as required. Install any required flashing. Install new white continuous gutters with downspouts and splash blocks. Haul away all construction related debris.