The Contractor’s services shall include closure construction for New Beulah Municipal Landfill. The project spans approximately 37.8 acres in size and construction includes: clearing and grubbing within the limits of disturbance, demolishing, decommissioning, and abandoning existing landfill gas features, constructing the final geosynthetic cover system, constructing and installing new landfill gas wells, piping, and flare, constructing condensate drains and leachate manhole modifications, constructing a cover access road, dewatering and cleaning out sediment basins, replacing spillways, constructing stormwater channels, downchutes, and terraces, permanently stabilizing disturbed areas, and maintaining permanent vegetation for a one-year warranty period.