STATEMENT OF WORK
The purpose of this request is for flooring replacement in three of the five village houses on the Perry Point campus. Veterans enrolled in Mental Health’s Constructive Work Therapy (CWT) program reside in these houses.
The Contractor shall completely prepare site for building operations, including demolition and removal of existing flooring, and furnish labor and materials to perform the work which includes the PP CWT/TR Homes 1118, 1119, 1159, 1160 & 1162.
The flooring in rooms, corridors and areas is to be replaced with J&J Classics II #V5023 - Color: Heirloom #1003, with an approximate square footage of an average 1053 SF as per quotes.
Work shall be completed in multiple phases around clinical schedule as necessary, and only after hours and weekends (including holidays), to allow the service to continue to function at normal hours with little to no interruptions of patient service and access during project. The period of performance will take up to 30 days once it is initiated.
The Contractor shall field verify before bid the requirements to install flooring under and around the existing modular wall system.