Specifications include, but are not limited to: demolition of the existing restroom at Halmos Park and the construction of a new one-story, 405 SF masonry restroom building with all mechanical and electrical components. It includes the purchase and the installation of all materials to complete the project within the plans and specifications.; CONSTRUCTION OF NEW MASONRY STRUCTURE, 12'-0" X 32'-0", TOILET ROOM BUILDING WITH WOOD TRUSS ROOF. THE BUILDING IS PROVIDED W/NATURAL VENTILATION AND REQUIRED DRAINAGE VALVES FOR ALL PLUMBING LINES FOR WINTERIZATION.; ALL INTERIOR MASONRY SURFACES SHALL BE PREPARED W/ I COAT BLOCK FILLER PRIMER AND 2 FINISH COATS OF PAINT; ALL SURFACES TO BE PAINTED, SHALL BE PRIMED WITH APPROPRIATE MATERIAL AND RECEIVE TWO FINISH COATS OF THE SELECTED FINISH, ACCENTS STRIPES, DECORATOR COATINGS, AND SIMILAR FINISHES SHALL BE APPLIED OVER THE REQUIRED SURFACE PAINTING.; PREPARE CONCRETE SLAB TO RECEIVE NEW FINISHES, REMOVE AND SMOOTH ALL IMPERFECTIONS THAT WOULD PROHIBIT PROPER APPLICATION OF NEW FINISHES, FLASH PATCH SLAB IS REQUIRED SUITABLE SUBSURFACE FOR NEW FINISHED. PROVIDE DIAMOND HARD CONCRETE COATING W/ NON-SLIP FINISH ON ALL INTERIOR CONCRETE SURFACES.