Specifications include, but are not limited to: i. Contractor shall remove and properly dispose of existing service pole and attached electricalequipment.ii. Contractor shall provide and install a new equivalent or identical electrical service pole with supportingelectrical transformers to restore the power back to fully operational status as per industry standard.iii. Olney Readiness Center receives electrical service power from PEPCO at 2000 amp incoming service.The primary voltage is 13.7KV with building distribution voltage at 480/277 volt, three phase, and fourwire system.iv. As required by law, the Contractor shall have at least one licensed master electrician or journeypersonpresent at the job site, in which these services are provided. A journeyperson can work on a jobsitewithout a master electrician present as long as the journeyperson is working under the direction andcontrol of a licensed master.5.3.2Contractor shall install any and all equipment in accordance with industry standards, includingOccupational Health and Safety (OSHA).