The renovation will address the most critical systems throughout the building: • Architectural • Structural • Mechanical • Lighting • Electrical • Plumbing • Fire Safety • Communication Limited changes to the building layout will focus on improving the main office and health suite. These changes may include but are not limited to any necessary changes in configuration of walls, ductwork, air terminal units, HVAC controls, plumbing, electrical receptacles and wiring, lighting and emergency lighting, fire and smoke detection devices, fire alarms, sprinkler infrastructure, security devices and communication infrastructure throughout the building. Other changes will improve the building finishes throughout the building to allow the building to serve its students for the next several decades, including but not limited to repainting/refinishing interior and exterior surfaces, replacement of ceiling grid and tiles (including sprinkler heads), replacement of all casework, replacement of flooring and repointing exterior bricks where needed.