a. This specification is intended to describe the modernization of one (1) hydraulic elevator, including (but not limited to), the complete replacement and installation of one (1) Certified Non-Proprietary hydraulic pump unit, controller, photo edge, and other updates as described herein. All work shall be performed in a workmanlike manner and is to be performed by a licensed elevator mechanic. In all instances where a device or a part of the equipment is referred to in the singular number, it is intended that such reference shall apply to as many such devices as are required to complete the installation. The Elevators will be brought up to new Code requirements for communication, and emergency services (audio/visual displays, call buttons, etc.) In addition, the elevator controls on all floors shall be converted from key operated to card reader/push button operated (after access is approved via the Card Reader). b. Work Included: 1. All engineering, equipment, labor, and permits required to satisfactorily complete elevator modernization required by Contract Documents. 2. Cartage and Hoisting: All required staging, hoisting, and movement to, on, and from the site including new equipment, reused equipment, or dismantling and removal of existing equipment. 3. Unless specifically identified as "Reuse", "Retain", or "Refurbish", provide new equipment. Hoistway, pit, and machine room barricades as required. 4. All work by others. This is a turn-key project.