Are there certain technical specifications (i.e. grain size, % moisture) for the material that should be used for the Project? Please explain. 16. Does the Project require permitting? a. If yes, what types of permits apply (i.e. air quality, water discharge, etc.)? b. Please provide a list of potential environmental impacts associated with the process. c. Are you prepared to obtain all necessary permits? 17. What is the annual minimum/maximum range of dredged material volume that would be required? Are there any anticipated seasonal fluctuations in material processing and/or demand? 18. What is the intended frequency, duration, and volume of dredged material to be removed? 19. Please describe the proposed method of removal of dredged material from the adjacent Cox Creek DMCF. a. Is the removal method continuous, dependent on weather or otherwise (batch production) cyclical in nature? 20. Does the process produce a byproduct which would require disposal? What are the disposal requirements? 21. Provide an estimated schedule and description of the steps required for your Project to be ready to start receiving and processing dredged material for IRBU efforts...