Specifications include, but are not limited to: -A full covering -Cost per foot of sub roof removal and replacement is sub roof insulation is compromised due to water infiltration or other damages -Listed criteria for sub roof replacement area and inspection process to verify those areas -Utilize contractor crane to remove satellite dish and weights to nearby ground from roof. County will dispose of satellite dish -The County will supply the safety rail at the roof hatch, a ladder to access the elevator tower and steps to reach the two roof areas that are more than 19" higher than the main roof. The contractor will install the safety rail and ladders and utilize extra coverage of roof material to do so if necessary.