Specifications include, but are not limited to: The Consultant will commission the following systems: All systems required to be commissioned by the USGBC LEED V4 for Schools rating system, including: o HVAC&R o Domestic Hot Water o Lighting and Daylighting Controls o On-Site Renewable Energy Systems (if applicable) Emergency Power Systems, including: o Emergency Generator(s) o Automatic Transfer Switches o Roll-up Generator Connection (if applicable) Building Enclosure Systems Audio Visual Systems and Equipment Security Systems The results of certain commissioning activities must be submitted to USGBC’s GBCI and the LEED consultant for submission pertaining to the LEED certification goals of the Program. The scope of work includes, but is not limited to, the following general tasks. a. Serve as the Commissioning Agent for MSA/City Schools on the Frederick Douglass Building project. b. Conduct formal design reviews and document in a formal report all comments on the compliance with the Owner’s Project Requirements (OPR) for the project, as well as the Basis of Design (BOD). The review report must also address completeness of design documents regarding system performance, operability, maintainability, energy efficiency and sustainability of the overall design during the pre-construction phase. At a minimum, the design reviews must confirm the design complies with the current statutes of State energy codes (2015 IECCASHRAE 90.1). Formal reviews are required, at each phase of A/E document submission. Additional reviews may be required at discretion of MSA if the design submissions are insufficient or incomplete.