Specifications include, but are not limited to: Replacement of the existing 6” water main and services on all roadways within the project area; the water main shall be replaced with the following: a. 530 linear feet of 8” diameter water main on Campus Avenue, between Sabattus Street and East Avenue. b. 550 linear feet of 6” diameter water main on Newman Street, between Campus Avenue and East Avenue. c. 775 linear feet of 8” diameter water main on Fairlawn Avenue, between East Avenue and Shirley Street. d. 850 linear feet of 6” diameter water main on Morris Avenue, between Brault Street and Dingley Street. e. 790 linear feet of 6” diameter water main on Stanley Street, between Sabattus Street and Montello Street. 2. Reconstruction of the following roadways: a. 650 linear feet of Campus Avenue (Sabattus to East). b. 700 linear feet of Newman Street (Campus to East). c. 780 linear feet of Fairlawn Avenue (East to Shirley). d. 650 linear feet of Stanley Street (Sabattus to Montello).