Specifications include, but are not limited to: 1. Removal of (E) EPDM roofing, cover board, metal flashing and wood blocking down to the (E) rigid insulation system (Insulation to remain). 2. Removal of (E) Standing Seam Metal Roofing, CDX structural Plywood, metal flashing and wood blocking down to the (E) rigid insulation system (Insulation to remain). 3. Removal of (E) perimeter Panel Standing Seam Metal siding and attachment system noted on Construction documents. 4. Installation of 1½” polyisocyanurate insulation, cover board, and 0.060 EPDM membrane surfacing, blocking, flashings/copings, retrofits roof drains, pipe boots, and all necessary roofing accessories. 5. Installation of metal panel siding and standoff metal framing system, flashings, and wood eave extension framing. 6. Preparation and paint applications of soffit and ceiling entry metal surfaces identified on construction documents. 7. Relocation of Mechanical intake air louver, including all necessary duct work redirection, preparation and painting of exterior louver surfaces, and reinstallation. 8. Removal/reinstallation and extension to new roof elevation of (E) rooftop mechanical vents/curbs and equipment necessary for reroofing applications.