Specifications include, but are not limited to: Water Main Replacement Scope: Replace approximately 3,400 linear feet of twelve (12) inch diameter water with new eight (8) inch water main. This shall include replacing three (3) hydrants, 600 linear feet of service connections, and installing base/subbase gravel within the water main trenches. Storm Drain Installation Scope: Install approximately 1,100 linear feet of six (6) and twelve (12) inch diameter underdrain/storm drain. This shall include installing six (6) catch basins and installing base and subbase gravel within the storm drain trenches. Roadway Rehabilitation and Sidewalk Reconstruction Scope: Rehabilitate approximately 3,400 linear feet of roadway and 2,600 linear feet of sidewalk as follows: Lower and plate all manholes and catch basins as needed prior to removing pavement. Remove existing pavement, fine grade, and add shim gravel as needed. Place 2.5” 19mm HMA base. Reconstruct bituminous sidewalk with slipform concrete curb. Set utilities to grade. Install new manhole and catch basin frame and covers/grates where noted. Grind butt joints as needed. Place 12.5mm HMA surface at 1.5” depth. Perform driveway preparation as needed. Perform lawn, driveway and shoulder follow up as needed.