Specifications include, but are not limited to: The complete and satisfactory construction of approximately nine hundred seventy (970) linear feet of ductile iron water main; one thousand four hundred (1,400) linear feet of HDPE water main replacement by pipe bursting; one thousand two hundred (1,200) linear feet of temporary water main; installing seven (7) ductile iron tees on existing large diameter water mains; three hundred twenty five (325) linear feet of storm drain; two hundred fifty (250) linear feet of sewer replacement; three (3) catch basins; ten (10) sewer and drain manholes; seven hundred (700) tons of Hot Mix Asphalt; one thousand three hundred (1,300) cubic yards of Aggregate Subbase/Base and all other incidental work as necessary to satisfactorily complete the project as outlined or implied in the Plans/Specifications.