Specifications include, but are not limited to: 0010 202.1292 REMOVE EXISTING STRUCTURAL TIMBER LUMP SUM LUMP SUM _________._____ _________._____ 0020 202.202 REMOVING PAVEMENT SURFACE SY 390.000 _________._____ _________._____ 0030 203.20 COMMON EXCAVATION CY 170.000 _________._____ _________._____ 0040 203.24 COMMON BORROW CY 80.000 _________._____ _________._____ 0050 203.25 GRANULAR BORROW CY 8.000 _________._____ _________._____ 0060 304.10 AGGREGATE SUBBASE COURSE - GRAVEL CY 220.000 _________._____ _________._____ 0070 403.208 HOT MIX ASPHALT 12.5 MM HMA SURFACE T 72.000 _________._____ _________._____ 0080 403.213 HOT MIX ASPHALT 12.5 MM BASE T 36.000 _________._____ _________._____ 0090 409.15 BITUMINOUS TACK COAT - APPLIED G 31.000 _________._____ _________._____ 0100 502.21 STRUCTURAL CONCRETE, ABUTMENTS AND RETAINING WALLS CY 1.500 _________._____ 0110 502.26 STRUCTURAL CONCRETE ROADWAY AND SIDEWALK SLABS ON STEEL BRIDGES LUMP SUM LUMP SUM _________._____ 0120 502.291 SAW CUT GROOVING LUMP SUM