Specifications include, but are not limited to: upgrade biosecurity measures and improve pumping and filtration into our research facility. A main goal is to minimize the disruptive impact of the renovation work on the various public access spaces, offices, and surrounding laboratories within the building. ; -study schematic design of current system and recommended upgrades; -create preliminary and final plans for architectural, mechanical, structural, electrical; -develop, design, specify and deliver plans for construction work, including bid documents -all typical design phases, bid document handling, and construction administration and oversight Work is expected to commence immediately, targeting a Fall 2020 bid date. The firm may be required to coordinate this work or additional work with other consultants contracted by the Owner.