Specifications include, but are not limited to: The project includes work at the intersections of India Street and Federal Street, Newbury Street, Middle Street, and Fore Street, as well as along the east side of High Street between Danforth and York Streets. OUTLINE OF WORK : The project includes, but is not strictly limited to the following items: Construction of ADA-compliant brick curb ramps, New and reset granite curbing, including modifications to the existing curb line, Drainage system modifications corresponding to the ramp construction, including reconstruction of and modifications to catch basins, and Re-construction of the concrete atop a CMP vault at the intersection of India Street and Fore Street, Construction of sidewalk segments including driveway crossing