Specifications include, but are not limited to: The City of Auburn is accepting written proposal for the Auburn Public Works Department for Snow Plowing & Removal. The Contractor shall have sufficient manpower and equipment for the plowing/removal of snow from the parking lots, roadways, and sidewalks as per instruction listed below for each Work Area and shown on the attached drawing. Plowing and removal will be required during the daytime in the travel aisle during a snowstorm and no windrow is to be left behind parked vehicles. WORK AREA #1 GREAT FALLS PARKING LOTS: The Contractor will be responsible for plowing and snow removal in the Great Falls Plaza parking lots, shown on the map labeled WORK AREA #1. Contractor will also be responsible for removing the windrows left by the Auburn Public Works Department, on a section of the Great Falls Plaza roadway that runs between the Auburn Inn and The Post Office. In general, less than 2" is not plowed, 2"to 3" will be per Public Works Department discretion and snow accumulation greater than 3" shall be plowed and removed. The contractor is hereby notified that unless the Public Works Department allows for temporary stockpiling, the contractor will be required to remove snow at each plowing and dispose of said snow at his own disposal site. Plowing and removal will be required during the daytime in the travel aisle during a snowstorm and no windrow is to be left behind parked vehicles. WORK AREA #1A GREAT FALLS PARKING LOT – SATELLITE: The Contractor will be responsible for plowing the Great Falls Satellite parking lot, shown on the map labeled WORK AREA #1A. In general, less than 2" is not plowed, 2" to 3" will be per Public Works Department discretion and snow accumulation greater than 3" shall be plowed. The back third (Northerly) of the lot shall not be plowed, this area shall be used by other contractors for snow dumping from snow removal at the 2 Great Falls Plaza parking area.