Specifications include, but are not limited to: Snow Plowing and Ice Control - Whiting, Trescott Twp., Lubec ; State Route 189, beginning at the intersection of U.S. Route 1 in Whiting (MP 0.00) and extending in an easterly direction to the United States border (MP 11.25) for a total distance of 11.25 centerline miles (22.50 Lane Miles). Contractor agrees to remove the snow (whether accumulating from snowfall or drifting), treat the roads, control ice, (whether naturally occurring or manmade) ensure water can get off of the road to any ditches or drainage structures blocked by snow or ice, and perform all other work indicated in this Contract in compliance with all the terms, conditions, and representations of the same (“the Work”) on the section(s) of highway listed below (“the Work Area”).