Site Preparation/Demolition Mobilization. Site layout. Erosion and sedimentation control. Demolition and disposal of items delineated on the plans and as necessary to complete the subsequent work. Removal, relocation, and replacement of site items as shown on the plans. Excavation as required to remove and dispose of pavement, gravels, and topsoil as required for subsequent work. Grading Plan and Drainage Plan Construct new field inlet catch basins at drainage locations between walkways. Construct new roadway catch basins and manholes. Construct new 12” storm drain to direct drainage toward the Androscoggin River and the existing drainage manhole on Beech Street. Materials Plan Beech Street improvements. Sidewalk improvements. New concrete pathway. New asphalt pathway. Stone dust gathering area. New ADA accessible ramps and parking spots. Concrete footing for Phase II seat wall. New Furnishings o Furnish and install approximately: 3 benches. 11 bollards. 4 waste receptacles. 1 needle disposal container. 6 picnic tables. 9 tree grates. 9 tree guards. Planting Plan Tree plantings as shown on the plans. Proposed plantings are listed on the plans. Lighting & Electrical Plans Removal and replacement of site electrical items as shown on the plans. Excavation as required to remove, and install electrical conduit, wiring, and associated equipment base materials Furnish & Install approximately: o 6 street lights o 5 pedestrian lights o 1 electrical equipment mount